Live
- Woman held for stealing gold worth Rs 12.5L
- Paddy inundated in over 2,000 acres in Palnadu dist
- IoT to play crucial role in future horticulture
- Rockwoods School celebrates Christmas with gaiety
- Kuppam Horticulture Hub shines with SKOCH Award
- Hyd’bad enjoys cool showers amidst X’mas festivities
- Hyderabad: City aglow with X’mas spirit
- Reliance CEO donates Rs. 1.11 cr to TTD
- Governor pays tributes to Vajpayee
- TTD to issue tokens for Vaikunta Dwara Darshan from January 9
Just In
MP Bandi Sanjay asks SCR GM Gajanan Mallya
Karimnagar: State BJP president and Karimnagar MP Bandi Sanjay Kumar has asked the SCR officials to speed up several ongoing railway projects in Karimnagar Parliamentary constituency.
He met South Central Railway (SCR) General Manager (GM) Gajanan Mallya in Secunderabad on Thursday and submitted a memorandum to the official. The MP asked the SCR official to undertake new projects in the constituency.
Bandi Sanjay wanted to commence tender process for the recently sanctioned ROB at Karimnagar railway station level crossing (LC) gate number 18 in view of traffic congestion. A ROB should be sanctioned at LC gate number 29 in the wake of increasing train traffic on Karimnagar-Nizamabad section on which lakhs of vehicles would be passing through Gangadhar.
The SCR General Manager was asked to complete the ROB works at Uppal-Kamalapur level crossing as soon as possible as the sanctioned ROB construction work was progressing slowly. Motorists were facing severe difficulties at the level crossing due to increase in goods and passenger trains in Karimnagar section.
MP Sanjay urged Mallya to take immediate steps towards construction of Karimnagar-Kazipet bypass railway line. The project was crucial in Secunderabad division and it should be taken as a top priority as the survey work has already been completed.
Karimnagar, Jammikunta, Bijigiri Sharif and Uppal railway have to be beautified. Karimnagar-Hasanparthy railway line survey over Huzurabad was long overdue and asked for the GM's personal attention to include the project in the coming budget.
The meeting was attended by Railway Chief Engineers Vishwanath and Srinivas Reddy.
© 2024 Hyderabad Media House Limited/The Hans India. All rights reserved. Powered by hocalwire.com