Live
- Gentle in manner, resolute in convictions: Sonia Gandhi pens emotional note for Dr. Manmohan Singh
- 2024: A landmark year for India's defence achievements and breakthroughs
- 2025 Horoscopes: Insights and Guidance by Pt. Umesh Chandra Pant
- Osamu Suzuki was a legendary figure in global auto industry: PM Modi
- “AMOEBA”: Celebrating the Journey of Telugu Entrepreneur Sri Motaparti Siva Rama Vara Prasad
- Sachin Khedekar recites a poem from director Feroz Abbas Khan’s powerful new play, ‘Hind 1957’
- NABL-QCI appoints Dr. Sandip Shah as chairperson
- Centre transfers Rs 2.23 lakh crore for 1,206 schemes under Direct Benefit Transfer
- BGT 2024-25: Watching Konstas bat reminds me of Symonds, says Hayden
- 75 iconic lighthouses in India saw more than 10 lakh visitors till September
Just In
Hyderabad: Major drive to end traffic hassles on axial roads
- GHMC and HRDCL take up missing link roads covering a stretch of 126 km
- Concept is the brainchild of Minister for MA&UD KTR. Once links are made, distance between two spots would be cut to less than half the present distance
Hyderabad: The Greater Hyderabad Municipal Corporation (GHMC) Town planning wing along with Hyderabad Road Development Corporation Limited (HRDCL) identified missing links/ slip roads of 126.2 km which are linking developed corridors. Around 44.7 km of 37 missing link roads with an estimated cost of Rs 313.65 crore is underway under Phase-I, of which four works have been completed. Nineteen works are under progress and land acquisition process is on for the remaining 14 works.
The concept is a brainchild of Minister for MA&UD K T Rama Rao. Once the missing links are constructed, the distance between the two spots would be reduced to less than half the present distance.
The locations were identified based on the amount of traffic in the area, present ease of connectivity and population density. From a macro planning perspective, it will provide critical radial connectivity for the city and reduce the pressure on the axial East-West zones roads, which are routinely clogged. The concept is small investment for large benefits.
What is a missing link?
Once the missing links are constructed, the distance between the two spots will be reduced to less than half the present distance.
The government constituted a special purpose vehicle named HRDCL for preparation of comprehensive plan for development of model road corridors for all the major roads in GHMC limits and adjoining ULBs to have minimum maintenance and trouble free roads in Hyderabad area with an intension to transform Hyderabad as Global City.
Power Corridors
Sl. No. | Name of corridor | Length(km) |
1 | Miyapur-Jeedimetla | 9.6 |
2 | Jeedimetla-Radhika, ECIL | 14.8 |
3 | Kushaiguda-BL Nagar | 6.5 |
4 | Neknampur Road-Shaikpet Dargah | 2.7 |
5 | Nizampet X Road_Hafeezpet | 4.6 |
6 | khajaguda-Alkapur | 3.8 |
7 | HCU Depot-Raghavendra Colony, Kondapur | 3.4 |
8 | Sun City, Chevella Road- Chintalmet | 3.2 |
| Total | 48.6 |
Railway Safety Works for FY21
Sl. No. | Location of ROB/ RUB | Proposal | Amount of estimate in Rs Crore |
1 | Malakpet | 1V of 11.0m × 4.458m |
|
| RUB | RCC Box | 18.14 |
2 | Ranigunj | 1V of 5.75m × 4.75m on |
|
| RUB | LHS and |
|
|
| 1V of 7.25m × 5.77m | 16.44 |
|
| on RHS |
|
3 | Fathenagar | 3 Lane ROB parallel to 45.04 |
|
| ROB | existing ROB |
|
4 | NFC | 3 Lane ROB parallel to | Rs. 32.02 Crs |
| ROB | existing ROB |
|
5 | Bollarum | 6 Lane ROB in lieu of |
|
| ROB | LC. No. 250 under cost |
|
|
| sharing basis | 57.33 |
|
| Total | 169.01 |