Live
- Bhumi Pednekar: Became an actor in a time where the way I looked was secondary
- PM Modi meets 31 global leaders during 3-nation tour
- Sneha Wagh says she couldn’t recognise herself in divine avatar
- Study shows why you regain lost weight
- Boosting digital health and AI research
- Adani Group stocks rebound as Sensex and Nifty surge
- Future-proofing career with industry-ready essential skills
- ‘Nation First’ key to India’s progress: Prez
- Who will be next Maha CM? Rift in Mahayuti, MVA
- Nutritional value of ration rice explained
Just In
Visakhapatnam: Retired bureaucrat expresses concern over CRZ violation
Former Union Energy Secretary EAS Sarma writes a letter to Secretary, Ministry of Environment, pointing out that the APTDC has undertaken construction at Rushikonda violating the CRZ norms
Visakhapatnam : Expressing concerns over environmental violations at Rushikonda on Wednesday, former Union Energy Secretary EAS Sarma dashed a letter to Secretary of the Ministry of Environment, Forests and Climate Change Leena Nandan on the continued violations committed by the AP Tourism Development Corporation (APTDC) in the construction activity undertaken by it at Rushikonda tourist complex.
Referring to the CRZ clearance issued by the Ministry in favour of APTDC for undertaking certain modifications to the existing tourism building complex at Rushikonda, the retired bureaucrat pointed out that instead of making modifications, the APTDC is about to complete the construction of huge new structures meant for an office complex in deviation from the conditions precedent to the clearance letter.
“APTDC has far exceeded the built-up area of 4,439 sq mt stipulated in the clearance letter as has become evident from the report of a committee appointed by the Ministry at the instance of the AP High Court. While the CRZ clearance communication prohibited the water drawing for construction from borewells, APTDC’s contractor has apparently drawn water exploiting the existing/ new borewells which is a clear violation of the CRZ clearance,” he mentioned in the letter.
Further, he said the APTDC dumped construction waste irresponsibly along the beach sands and the adjacent CRZ areas. Sarma reiterated that the circumstances leading to the apex court ordering the demolition of the Maradu multi-storeyed buildings in Kerala for similar violation of CRZ norms and wondered how it is different from the APTDC committing similar violations in the case of Rushikonda tourist complex.
Meanwhile, a Division Bench of the Andhra Pradesh High Court directed the Ministry of Environment, Forest and Climate Change (MoEF and CC) to take an appropriate decision on the constructions undertaken by the AP Tourism Development Corporation atop Rushikonda.
The move comes following a report filed by the expert committee nominated by the High Court. Further, the court said the MoEF & CC should make an assessment on the violations’ impact that was listed in the report submitted by the expert committee before taking a decision.
© 2024 Hyderabad Media House Limited/The Hans India. All rights reserved. Powered by hocalwire.com