Live
- Physically-challenged girl receives wheelchair
- Two hostel girls attempt suicide
- Sec’bad Cantt set to get SNDP push to tide over sewage woes
- Minister rules out fixing smart meters to farm pump sets
- BJP will kick out infiltrators once in power in Jharkhand: Yogi
- Priest injured in explosion near temple
- Party polling booth, mandal elections to be completed by Nov-end: Kishan
- HYDRA, TGPCB to jointly protect water quality in lakes
- Are strict laws needed to ensure MLAs attend Assembly sessions?
- Police arrest notorious inter-state OLX fraudster who duped 200 people
Just In
Vijayawada: Government offices to vacate Swarajya Maidan for Ambedkar Memorial
The State government is taking measures to start the construction works of Dr Ambedkar memorial at Swarajya Maidan, in the heart of the city
Vijayawada: The State government is taking measures to start the construction works of Dr Ambedkar memorial at Swarajya Maidan, in the heart of the city.
As part of the measures, initially some government offices belonging to Irrigation department located in Swarajya Maidan will be shifted to other places and the land will be handed over to the Social Welfare department for construction of memorial.
A giant 125 feet statue of Dr BR Ambedkar will be installed their. Besides, Ambedkar memorial hall, study centre, library, air theatre will be set up and landscaping will be made to make it a tourist centre. Swarajya Maidan spread over 21 acres of land. After construction of RytuBazaar, government offices, private college, quarters for government staff, the maidan shrunk to 18 acres.
Krishna district Collector J Nivas on Wednesday convened a meeting with the officials and instructed the latter to take measures to relocate the existing government offices from the Swarajya Maidan to other places. As part of it, Irrigation central division office, special division office, deputy engineer eastern sub-division office will be shifted to RTC complex building.
Office of the irrigation chief engineer, deputy executive engineer, RC sub-division engineer, deputy engineers, assistant engineers, Tarakarama project, chief engineer quality control will be shifted to newly constructed irrigation office at the irrigation compound, Suryarao Pet. Pulichintala executive engineer office and sub-divisional offices will be relocated to old municipal complex office, Beasant Road.
Collector Nivas instructed officials to take measures to relocate the offices in one week. Instructions were also given for shifting the office of information and public relations, inland water ways and Rytu Bazar to other locations.
Joint Collectors K Madhavi Latha, L Siva Sankar, Vijayawada Municipal Corporation Commissioner Prasanna Venkatesh, in-charge sub-collector K Rajyalakshmi, irrigation superintending engineer K Narasimha Murthy and other officials attended the meeting.
© 2024 Hyderabad Media House Limited/The Hans India. All rights reserved. Powered by hocalwire.com